Client: PT Semen Bumi Nusantara
Challenge:
The client faced frequent production delays due to inefficient material handling systems and outdated conveyor components.
Solution:
SEIN redesigned the conveyor structure using reinforced steel fabrication and installed SEIN’s HeavyFlow Conveyor System, integrating automated sensors for real-time performance tracking.
Result:
Production efficiency increased by 35%, energy consumption was reduced by 15%, and downtime dropped significantly.
The plant now operates continuously with improved throughput and lower maintenance costs.

Client: PT Baja Mandiri...