Client: PT Marine Energi Abadi
Challenge:
The client required a customized crane system capable of handling 250-ton loads in challenging offshore environments.
Solution:
SEIN’s engineering team developed a corrosion-resistant heavy-lift crane with automated load balancing and hydraulic stabilization.
Result:
The crane system successfully operated in high-humidity, high-salinity conditions, cutting installation time by 25% and improving overall project safety.
The system is now used as a model for future offshore infrastructure projects in the region.

Client: PT Baja Mandiri...